Prototyping
Development and Prototype Molds
3D Printing:
THPL printing: We select the appropriate process based on the customer's specifications and requirements. Alternatively, we offer LSR 3D printing using silicone material; however, this does not correspond to the original material.
Test Mold
Here, the components are manufactured using the injection molding process. The untreated cavity parts are approximately equivalent to production quality. The test parts are produced from full-scale cavities and are close to production quality. The prototyping process is semi-automated or, upon customer request, fully automated.
Express Mold
In this process, the components are manufactured using a manual cartridge casting method from a 3D-printed Thermoplast Express mold or a milled aluminum mold.
Pre-Production
Pre-production can accommodate all material combinations: For 1K systems, the number of cavities ranges from one to four, depending on the part size. For 2K systems, the number of cavities is configured as one plus one, or four plus four—again, depending on the part size. A modular system for different injection molding systems and mold concepts enables RICO to implement all 1K and 2K mold concepts and produce pre-series samples, each in a fully automated process.
| Criterion | 3D Printing | Express Mold | Test Mold | Pre-Production |
|---|---|---|---|---|
| Application | Demo Parts | Demo Parts | Test parts | Pre-production run |
| 1K / 2K | 1K | 1K / 2K | 1K / 2K | 1K / 2K |
| Part Quality | 3D printing, depending on the process | Not in tolerance | Close to production quality | Meet production-quality standards |
| Concept | 3D Printing | Manual Cartridge Casting Process | Semi-automatic | The pre-production concept matches the production model |
| Material | No original material | Whenever possible, the original material is used | Original material | Original material |
| Quantity | Up to 10 pieces | Up to 10 pieces | Up to 1,000 pieces | Up to 100,000 units |
| Lead time | 1–2 weeks | 2 weeks | 5–8 weeks | 15–20 weeks |
Product Development Process: